Skip to content
This repository has been archived by the owner on Dec 30, 2023. It is now read-only.
Carlos Garcia Saura edited this page Oct 1, 2015 · 27 revisions

Assembly instructions for Cyclone PCB Factory

Photo

Instructions

Download all the necessary files from the Releases section of the GitHub repository.
Then follow the instruction manual in this order:

  1. Assembly of the Y axis
  2. Assembly of the X axis
  3. Assembly of the Z axis
  4. Connection of the electronics

Instrucciones en Español / Instructions in Spanish

  1. Montaje del eje Y (PDF)
  2. Montaje del eje X (PDF)
  3. Montaje del eje Z (PDF)
  4. Conexión de la electrónica (PDF)

Need support? Join the Mail list / Forum

If you are interested in this project, please consider joining our mail list:
English: https://groups.google.com/forum/#!forum/cyclone-pcb-factory
Spanish/Español: https://groups.google.com/forum/#!forum/cyclone-pcb-factory-es

Credits

Original instructions by bq.
CC-BY-SA
License: Attribution - Share Alike - Creative Commons (http://creativecommons.org/licenses/by-sa/4.0/)

Contributors

  • Carlos Garcia Saura
  • Roberto Barrilero
  • Add your name here if you contribute to the wiki

Disclaimer

This hardware/software is provided "as is", and you use the hardware/software at your own risk. Under no circumstances shall any author be liable for direct, indirect, special, incidental, or consequential damages resulting from the use, misuse, or inability to use this hardware/software, even if the authors have been advised of the possibility of such damages.

Clone this wiki locally