Skip to content

comm/transports/ImcUdpTransport: Fix null pointer. #269

comm/transports/ImcUdpTransport: Fix null pointer.

comm/transports/ImcUdpTransport: Fix null pointer. #269

Triggered via push July 14, 2024 15:46
Status Failure
Total duration 44s
Artifacts

gradle.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

11 errors
build (macos-latest, 8)
Could not find satisfied version for SemVer '8'. Available versions: 22.0.1+8, 22.0.0+36, 21.0.3+9.0.LTS, 21.0.2+13.0.LTS, 21.0.1+12.0.LTS, 21.0.0+35.0.LTS, 20.0.2+9, 20.0.1+9, 20.0.0+36, 19.0.2+7, 19.0.1+10, 19.0.0+36, 18.0.2+101, 18.0.2+9, 18.0.1+10, 18.0.0+36, 17.0.11+9, 17.0.10+7, 17.0.9+9, 17.0.8+101, 17.0.8+7, 17.0.7+7, 17.0.6+10, 17.0.5+8, 17.0.4+101, 17.0.4+8, 17.0.3+7, 17.0.2+8, 17.0.1+12, 17.0.0+35, 11.0.23+9, 11.0.22+7.1, 11.0.22+7, 11.0.21+9, 11.0.20+101, 11.0.20+8, 11.0.19+7, 11.0.18+10, 11.0.17+8, 11.0.16+101, 11.0.16+8, 11.0.15+10
build (windows-latest, 8)
The job was canceled because "macos-latest_8" failed.
build (windows-latest, 8)
The operation was canceled.
build (windows-latest, 11)
The job was canceled because "macos-latest_8" failed.
build (windows-latest, 11)
The operation was canceled.
build (ubuntu-latest, 11)
The job was canceled because "macos-latest_8" failed.
build (ubuntu-latest, 11)
The operation was canceled.
build (ubuntu-latest, 8)
The job was canceled because "macos-latest_8" failed.
build (ubuntu-latest, 8)
The operation was canceled.
build (macos-latest, 11)
The job was canceled because "macos-latest_8" failed.
build (macos-latest, 11)
The operation was canceled.