Update development dependencies #122
pr-check.yml
on: pull_request
Matrix: 🧪 Tests
🔍 Lint
14s
🎨 Format
10s
Coveralls Finished
0s
Annotations
10 errors
🎨 Format
Process completed with exit code 1.
|
🧪 Tests (3.7)
Process completed with exit code 1.
|
🔍 Lint
Process completed with exit code 1.
|
🧪 Tests (3.8)
The job was canceled because "_3_7" failed.
|
🧪 Tests (3.8)
The operation was canceled.
|
🧪 Tests (3.10)
The job was canceled because "_3_7" failed.
|
🧪 Tests (3.10)
The operation was canceled.
|
🧪 Tests (3.11)
The job was canceled because "_3_7" failed.
|
🧪 Tests (3.11)
The operation was canceled.
|
🧪 Tests (3.9)
The operation was canceled.
|