Notifications
You must be signed in to change notification settings - Fork 25
/
example_PTC.txt
86 lines (79 loc) · 5.28 KB
/
example_PTC.txt
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
# Example: Production Tax Credit (PTC)
# ***Subsurface technical parameters***
# *************************************
Reservoir Model,1, ---Multiple Fractures reservoir model
Reservoir Depth,5, ---[km]
Number of Segments,1, ---[-]
Gradient 1,55, ---[deg.C/km]
Maximum Temperature,500, ---[deg.C]
Number of Production Wells,2, ---[-]
Number of Injection Wells,2, ---[-]
Production Well Diameter,7, ---[inch]
Injection Well Diameter,7, ---[inch]
Ramey Production Wellbore Model,1, ---0 if disabled 1 if enabled
Production Wellbore Temperature Drop,.5, ---[deg.C]
Injection Wellbore Temperature Gain,0, ---[deg.C]
Production Flow Rate per Well,55, ---[kg/s]
Fracture Shape,3, ---[-] Should be 1 2 3 or 4. See manual for details
Fracture Height,900, ---[m]
Reservoir Volume Option,3, ---[-] Should be 1 2 3 or 4. See manual for details
Number of Fractures,20, ---[-]
Reservoir Volume,1000000000, ---[m^3]
Water Loss Fraction,.02, ---[-]
Productivity Index,5, ---[kg/s/bar]
Injectivity Index,5, ---[kg/s/bar]
Injection Temperature,50, ---[deg.C]
Maximum Drawdown,1, ---[-] no redrilling considered
Reservoir Heat Capacity,1000, ---[J/kg/K]
Reservoir Density,2700, ---[kg/m^3]
Reservoir Thermal Conductivity,2.7, ---[W/m/K]
# ***SURFACE TECHNICAL PARAMETERS***
# **********************************
End-Use Option,1, ---[-] Electricity
Power Plant Type,2, ---[-] Supercritical ORC
Circulation Pump Efficiency,.8, ---[-] between .1 and 1
Utilization Factor,.9, ---[-] between .1 and 1
Surface Temperature,20, ---[deg.C]
Ambient Temperature,20, ---[deg.C]
# ***CAPITAL AND O&M COST PARAMETERS***
# *************************************
Well Drilling and Completion Capital Cost Adjustment Factor,1, ---[-] Use built-in correlations
Well Drilling Cost Correlation,1, ---[-] Use built-in correlations
Reservoir Stimulation Capital Cost Adjustment Factor,1, ---[-] Use built-in correlations
Surface Plant Capital Cost Adjustment Factor,1, ---[-] Use built-in correlations
Field Gathering System Capital Cost Adjustment Factor,1, ---[-] Use built-in correlations
Exploration Capital Cost Adjustment Factor,1, ---[-] Use built-in correlations
Wellfield O&M Cost Adjustment Factor,1, ---[-] Use built-in correlations
Surface Plant O&M Cost Adjustment Factor,1, ---[-] Use built-in correlations
Water Cost Adjustment Factor,1, ---[-] Use built-in correlations
# *** Economic/Financial Parameters ***
# *************************************
Plant Lifetime,30, --- [years]
Economic Model,3, --- Should be 1 (FCR model) 2 (Standard LCOE/LCOH model) or 3 (Bicycle model).
Fraction of Investment in Bonds,0.65, --- [-] Required if Bicycle model is selected. See manual for details.
Inflated Bond Interest Rate,0.07, --- [-] Required if Bicycle model is selected. See manual for details.
Inflated Equity Interest Rate,0.12, --- [-] Required if Bicycle model is selected. See manual for details.
Inflation Rate,0.025, --- [-] Required if Bicycle model is selected. See manual for details.
Combined Income Tax Rate,0.392, --- [-] Required if Bicycle model is selected. See manual for details.
Gross Revenue Tax Rate,0, --- [-] Required if Bicycle model is selected. See manual for details.
Investment Tax Credit Rate,0, --- [-] Required if Bicycle model is selected. See manual for details.
Property Tax Rate,0, --- [-] Required if Bicycle model is selected. See manual for details.
Inflation Rate During Construction,0, --- [-]
Well Drilling and Completion Capital Cost Adjustment Factor,1, --- [-] Use built-in well cost correlation as is
Well Drilling Cost Correlation,1, --- [-] Use built-in well drilling cost correlation #1
Reservoir Stimulation Capital Cost,0, --- [M$/injection well] Reservoir stimulation capital cost per injection well
Surface Plant Capital Cost Adjustment Factor,1, --- [-] Use built-in surface plant cost correlation as is
Field Gathering System Capital Cost Adjustment Factor,1, --- [-] Use built-in pipeline distribution cost correlation as is
Exploration Capital Cost Adjustment Factor,1, --- [-] Use built-in exploration cost correlation as is
Wellfield O&M Cost Adjustment Factor,1, --- [-] Use built-in wellfield O&M cost correlation as is
Water Cost Adjustment Factor,1, --- [-] Use built-in water cost correlation as is
Surface Plant O&M Cost Adjustment Factor,1, --- [-] Use built-in surface plant O&M cost correlation as is
Production Tax Credit Electricity, 0.05, --- [-] Production tax credit for electricity in $/kWh
Production Tax Credit Heat, 0.05, --- [-] Production tax credit for electricity in $/kWh
Production Tax Credit Cooling, 0.05, --- [-] Production tax credit for electricity in $/kWh
Production Tax Credit Duration, 10, --- [-] Production tax credit for duration in years
Production Tax Credit Inflation Adjusted, True, --- [-] Is the Production tax credit inflation adjusted (T/F)
# ***Simulation Parameters***
# ***************************
Print Output to Console,1, ---[-] Should be 0 (don't print results) or 1 (print results)
Time steps per year,6, ---[1/year]