Skip to content

Latest commit

 

History

History
19 lines (12 loc) · 369 Bytes

README.md

File metadata and controls

19 lines (12 loc) · 369 Bytes

Coinbase Exchange Order Book

Based on https://github.com/yoblin/PyLimitBook

Use real money at your own risk!

Install

  1. pip3 install -r requirements.txt
  2. python3 main.py

Optional:

  • To get low latency use AWS read through / run deployment.py
  • To see how you're doing, set up a private Twitter account and use twitter.py

TODO

  1. Tests
  2. Documentation