Skip to content

build(deps): bump tokio-util from 0.7.11 to 0.7.12 #5116

build(deps): bump tokio-util from 0.7.11 to 0.7.12

build(deps): bump tokio-util from 0.7.11 to 0.7.12 #5116

Triggered via pull request September 5, 2024 11:47
Status Failure
Total duration 15m 48s
Artifacts 8

ci.yml

on: pull_request
Matrix: build
Matrix: docker_tests
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

22 errors and 2 warnings
bdk_test
Process completed with exit code 1.
test (macos-latest)
Process completed with exit code 101.
test (ubuntu-latest)
The job was canceled because "macos-latest" failed.
test (ubuntu-latest)
The operation was canceled.
docker_tests (concurrent_bobs_before_xmr_lock_proof_sent)
Process completed with exit code 101.
docker_tests (alice_punishes_after_restart_bob_dead)
The job was canceled because "concurrent_bobs_before_xm" failed.
docker_tests (ensure_same_swap_id)
The job was canceled because "concurrent_bobs_before_xm" failed.
docker_tests (ensure_same_swap_id)
The operation was canceled.
docker_tests (happy_path_bob_offline_while_alice_redeems_btc)
The job was canceled because "concurrent_bobs_before_xm" failed.
docker_tests (happy_path_bob_offline_while_alice_redeems_btc)
The operation was canceled.
docker_tests (happy_path_restart_bob_before_xmr_locked)
The job was canceled because "concurrent_bobs_before_xm" failed.
docker_tests (happy_path_restart_bob_before_xmr_locked)
The operation was canceled.
docker_tests (happy_path_restart_bob_after_xmr_locked)
The job was canceled because "concurrent_bobs_before_xm" failed.
docker_tests (happy_path_restart_bob_after_xmr_locked)
The operation was canceled.
docker_tests (happy_path_restart_alice_after_xmr_locked)
The job was canceled because "concurrent_bobs_before_xm" failed.
docker_tests (happy_path_restart_alice_after_xmr_locked)
The operation was canceled.
docker_tests (concurrent_bobs_after_xmr_lock_proof_sent)
The job was canceled because "concurrent_bobs_before_xm" failed.
docker_tests (concurrent_bobs_after_xmr_lock_proof_sent)
The operation was canceled.
docker_tests (happy_path)
The job was canceled because "concurrent_bobs_before_xm" failed.
docker_tests (happy_path)
The operation was canceled.
docker_tests (punish)
The job was canceled because "concurrent_bobs_before_xm" failed.
docker_tests (punish)
The operation was canceled.
build (x86_64-pc-windows-msvc, windows-latest)
No files were found with the provided path: target/x86_64-pc-windows-msvc/debug/asb. No artifacts will be uploaded.
build (x86_64-pc-windows-msvc, windows-latest)
No files were found with the provided path: target/x86_64-pc-windows-msvc/debug/swap. No artifacts will be uploaded.

Artifacts

Produced during runtime
Name Size
asb-aarch64-apple-darwin
27.4 MB
asb-armv7-unknown-linux-gnueabihf
99.7 MB
asb-x86_64-apple-darwin
28.8 MB
asb-x86_64-unknown-linux-gnu
106 MB
swap-aarch64-apple-darwin
27.3 MB
swap-armv7-unknown-linux-gnueabihf
95.8 MB
swap-x86_64-apple-darwin
28.6 MB
swap-x86_64-unknown-linux-gnu
104 MB