Action Points

Teams keep improvement points in the process backlog as separate tasks in Jira and place them in the working space of each team.

Purpose

  • transparency for the team and the organization;
  • the ability to take tasks in a sprint in an explicit form, keep them in focus and not separate tasks for improving processes from any other activities in the sprint backlog;
  • the ability to plan by sprints and embed in the overall roadmaps of the team;
  • the ability to use analytics from the workflow;
  • identifying growth points in the context of clusters and departments, integration with the TMBP dashboard.

Improvement Action Points

  • action points from sprint retrospectives, OKRs, projects;
  • development tasks that were created as a result of retrospectives;
  • action points after passing the Team Maturity Model.

Action Points Flow

  • one action = one task;
  • the type of task is Task;
    • type of task can be User Story / Enabler, if during the retrospective, tasks were identified, related to the code and they completely close the Action.
  • each task has a single standard label:
    • retrospective for all process changes identified at the retro;
    • TMM for points that were created after passing the TMM:
      • as you can see, tasks from the coach's backlog / side activities and side activities do not need to be marked with a standardized label, but it is welcome to keep them in the same epic and / or on the same board.
  • Epic contains [TeamName] Process Changes in the name:
    • the epic also has labels;
    • a single epic or by quarters / types of work — at the discretion of the team.
  • tasks for Action Points are added to the sprint backlog and are kept in the same way as regular tasks, but are not estimated;
  • assignee for tasks in the backlog may be absent if the task in the process backlog is not prioritized;
  • the tasks that will be taken to the sprint more that in a quarter have Low priority label;
  • the Actions with TMM label are displayed in TMPB dashboard.