uProject

uProject draws a simple Gantt chart PDF from a YAML description.

It's good for quickly creating and modifying timelines of simple projects. It's designed to be more efficient than doing the same thing in a graphics package, and to produce reasonably attractive output. But it's purely a drawing tool, not a project management tool. It understands activities with relative dates and dependencies, but it won't find the critical path or resolve dependency order.

Dependencies

Requires Python 2.7 and pyfpdf; the latter can be installed easily with:

pip install fpdf

You might also want pykwalify to validate input a bit better:

pip install pykwalify

Usage

Download this repository and run the standalong script uproject.py. There's a demo included in the repository:

uproject.py demo.yml

This will produce output demo.pdf.

Most current features are shown in demo.yml, which is fairly self-explanatory, but also described briefly below.

Input format

The timeline is defined in YAML. If you install pykwalify the script will be checked against a schema and you'll get reasonably helpful messages about missing or invalid keys.

Otherwise (or if you make a content error that falls within the schema) you will probably just get an exception during drawing.

Project metadata (required)

The file should begin with these mandatory keys:

project: MyProject      # name of project, used in title/footer
version: 1.4            # timeline version, used in footer
unit: week              # time unit: 'week' or 'month'
length: 20              # timeline length in units
start: 2015-11-30       # start date of first unit

The 'week' unit starts on Monday. The 'month' unit starts on the first of each calendar month.

Options (optional)

You may define options to control formatting. Defaults for each value within this are shown in parentheses.

options:
    key_legend: true    # add a legend under the timeline (false)
    key_in_block: true  # also put key names inside blocks (false)
    show_year: true     # put year above first unit in January (true)
    title: 'Text'       # override title ('MyProject timeline')
    footer: 'Text'      # override footer (title + version)
    label_width: 40.0   # label column width (50.0mm)
    one_based: true     # number weeks/months from 1, not 0 (false)

You may set title or footer to false to disable them entirely.

If you set one_based to true, both the time axis labels and the interpretation of activity timings are affected: so you should decide whether you wnat this before writing the detail of your project.

Keys (optional)

You may define keys for a set of label-colour pairs to be associated with categories of activity:

keys:
  - name: Dev team
    color: [150,70,70]
  - name: Ops team
    color: [80,150,80]

Note American spelling (color, not colour).

Rows (required)

The actual timeline is defined as a list within the rows key, one element per row.

rows:
  - name: A1 activity
    at: 2015-11-30
    length: 2
  - name: A2 milestone
    at: A1
    dep: A1

The following keys are valid. Each row must have name and at least one of at, phases, breaks, or gap.

  • name is shown in the label column. May be empty string.

  • at is start time. May be a unit index (eg 2), date (eg 2015-11-30), or a reference (eg A1; see below).

  • length is duration in time units. May be fractional. Omit length to define a milestone.

  • stripe overrides alternating row highlight for this row only; boolean.

  • dep is a dependency, or list of dependencies; same syntax as references in start time, see below.

  • key matches the block to a name in the keys section.

  • breaks defines a list of blocks to appear on one row, eg to show holidays. Each item must define name, at, and length.

  • phases defines a list of time periods, eg to show 'Phase 1' and 'Phase 2'. Each item must define name, at, and length.

  • gap is true to add a blank/heading row.

Time references

Time references (in at or dep) are regex matches to row names. Matches are case insensitive and match from the start of the name to a word boundary.

Prefix - matches the start, prefix + matches the end.

The the reference is a 2-tuple instead of a string, the first value is the regex to match and the second is an offset in time units.

The first matching row is always used.

Given two activity blocks named:

A10 specification
A1 development

The following matches work:

A10         End of block 1
-A10        Start of block 1
[A10,2]     2 units after the end of block 1
A1          End of block 2
[A1,-1.5]   1.5 units before the end of block 2

Prefixing row names with codes like A1 is optional; you could just use descriptive names, and retype them as references.

If dep is a list, it is assumed to be a list of multiple dependencies; so to define a single dependency with an offset, use:

[[A1,-1.5]]