Skip to content

Reorganize the tests into unit/functional/integration/external #65

Reorganize the tests into unit/functional/integration/external

Reorganize the tests into unit/functional/integration/external #65

Triggered via pull request November 23, 2023 18:49
Status Failure
Total duration 17m 38s
Artifacts

ci.yml

on: pull_request
pre-commit  /  pre-commit
17s
pre-commit / pre-commit
pre-commit  /  lint-extension
1m 58s
pre-commit / lint-extension
Matrix: test-conda / test-conda
Matrix: test-pip / test-pip
Matrix: test_categories / test-pip
build  /  build
build / build
Fit to window
Zoom out
Zoom in

Annotations

9 errors, 1 warning, and 1 notice
test-pip / test-pip (3.x, ~=4.0, true)
Process completed with exit code 1.
test-conda / test-conda (ubuntu-latest, 3.11)
Process completed with exit code 1.
test-conda / test-conda (windows-latest, 3.11)
The job was canceled because "ubuntu-latest_3_11" failed.
test-conda / test-conda (windows-latest, 3.11)
The operation was canceled.
test-conda / test-conda (macos-latest, 3.11)
The job was canceled because "ubuntu-latest_3_11" failed.
test-conda / test-conda (macos-latest, 3.11)
The operation was canceled.
test-pip / test-pip (3.13-dev, true)
Process completed with exit code 1.
test-pip / test-pip (3.x, true)
Process completed with exit code 1.
pass
Process completed with exit code 1.
🎭 Playwright Run Summary
16 passed (2.2m)