Assuming kW as the base unit for flows, means, that at least 9 kWh have to go through that flow. For short time horizons, that can be a low number, for time horizons lower than 4.5 h, the problem becomes infeasible. In my opinion, we should replace this by a minimum and maximum average load, respectively.
Currently, we have parameters
full_load_time_min
andfull_load_time_max
, respectively.Assuming kW as the base unit for flows, means, that at least 9 kWh have to go through that flow. For short time horizons, that can be a low number, for time horizons lower than 4.5 h, the problem becomes infeasible. In my opinion, we should replace this by a minimum and maximum average load, respectively.
This would mean 18/4 = 4.5 full load hours for a time horizon of 18 hours but 8760/4 = 2190 full load hours if a full year is optimised.
The text was updated successfully, but these errors were encountered: