Skip to content

Weight of each event with wigner distribution corrected to account fo… #786

Weight of each event with wigner distribution corrected to account fo…

Weight of each event with wigner distribution corrected to account fo… #786

Triggered via push November 22, 2024 17:27
Status Failure
Total duration 56s
Artifacts

cmake.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

8 errors
MacOS 14
The `brew link` step did not complete successfully
MacOS 14
Process completed with exit code 1.
Ubuntu Latest Clang
The job was canceled because "MacOS_14_macos-14_clang_c" failed.
Ubuntu Latest Clang
The operation was canceled.
MacOS 13
The job was canceled because "MacOS_14_macos-14_clang_c" failed.
MacOS 13
The operation was canceled.
Ubuntu Latest GCC
The job was canceled because "MacOS_14_macos-14_clang_c" failed.
Ubuntu Latest GCC
The operation was canceled.