Skip to content

fix: update protobuf download and generation for ibc-go v4 #28648

fix: update protobuf download and generation for ibc-go v4

fix: update protobuf download and generation for ibc-go v4 #28648

Triggered via pull request January 18, 2024 19:47
Status Cancelled
Total duration 1m 12s
Artifacts

integration.yml

on: pull_request
pre_check  /  Check preconditions and cancel previous jobs
6s
pre_check / Check preconditions and cancel previous jobs
Matrix: getting-started
deployment-test
32s
deployment-test
test-docker-build
30s
test-docker-build
finalize-integration-result
0s
finalize-integration-result
Fit to window
Zoom out
Zoom in

Annotations

9 errors and 1 warning
getting-started (registry/npm)
The operation was canceled.
getting-started (link-cli/yarn)
The operation was canceled.
getting-started (registry/yarn)
The operation was canceled.
getting-started (registry/npx)
The operation was canceled.
test-docker-build
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/8769/merge' exists
test-docker-build
The operation was canceled.
deployment-test
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/8769/merge' exists
deployment-test
An error occurred trying to start process '/usr/bin/bash' with working directory '/home/runner/work/agoric-sdk/agoric-sdk/./networks'. No such file or directory
deployment-test
The operation was canceled.
deployment-test
No files were found with the provided path: ./networks/chaintest/results. No artifacts will be uploaded.