chore: Set failed proof store for spartan deployments #34087
Annotations
2 errors and 2 warnings
Bootstrap (l1-contracts, avm-transpiler, noir-projects, yarn-project)
Timeout: SSH could not connect to 18.219.28.36 within 60 seconds.
|
Bootstrap (l1-contracts, avm-transpiler, noir-projects, yarn-project)
Failed to delete runner: Error: Parameter token or opts.auth is required
|
Bootstrap (l1-contracts, avm-transpiler, noir-projects, yarn-project)
Taking down spot as it has no SSH! If we were mistaken, this could impact existing jobs.
|
The following artifacts were uploaded using a version of actions/upload-artifact that is scheduled for deprecation: "palla-configure-gcs-failed-proofs.protocol_circuits_report.json", "palla-configure-gcs-failed-proofs.public_functions_report.json".
Please update your workflow to use v4 of the artifact actions.
Learn more: https://github.blog/changelog/2024-04-16-deprecation-notice-v3-of-the-artifact-actions/
|
Loading