Shaping work

Philip Levy edited this page Nov 29, 2020 · 1 revision

What does it mean for work to be shaped in the context of Bixal Methods?

  • Addresses a specific problem or opportunity.
  • Outlines a general approach, but not necessarily a fully-formed solution.
  • Takes into account the cycle timeframe and is achievable in that time.

What happens after work is shaped?

  • Discuss as a team to determine the priority.
  • Product Owner gives the green light or defers.
  • Work is set for next cycle milestone.
  • Issue log is cleared out. (This is so we can start each cycle with a fresh perspective and not feel like we're burdened with considering every possible idea that has been posed previously.)

Acceptance criteria

  • Create milestone with mix of learn, make, and tech items.
  • Create draft release.
  • Issue Log cleared.