Skip to content

Bump peaceiris/actions-gh-pages from 3 to 4 #287

Bump peaceiris/actions-gh-pages from 3 to 4

Bump peaceiris/actions-gh-pages from 3 to 4 #287

Triggered via pull request April 8, 2024 16:15
Status Failure
Total duration 2m 7s
Artifacts

test.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
test (3.11)
Process completed with exit code 2.
test (3.10)
The job was canceled because "_3_11" failed.
test (3.10)
The operation was canceled.
test (3.9)
The job was canceled because "_3_11" failed.
test (3.9)
The operation was canceled.