Skip to content

Commit

Permalink
Fixed table values (#27)
Browse files Browse the repository at this point in the history
* Fixed numbers in wrong table entries.
  • Loading branch information
drnick23 authored Feb 22, 2024
1 parent 6305a4e commit ca0b89b
Show file tree
Hide file tree
Showing 2 changed files with 1 addition and 0 deletions.
1 change: 1 addition & 0 deletions README.md
Original file line number Diff line number Diff line change
Expand Up @@ -52,6 +52,7 @@ The performance of these solutions is contrasted with NoSSD's leading C15 plot f
</p>

<sub>1: Hardware Cost includes expenses for disks and GPUs, calculated at $16 per installed TB and $1600 for a 4090 GPU. GPU costs are adjusted to utilization—e.g., at 38% utilization, only 38% of the GPU cost is counted. This approach ensures costs are proportionally represented for a fair comparison within a $10,000 investment.</sub>
<sub>2: For NoSSD a 3.5% is deducted from rewards. Since DrPlotter fees are already incorporated into it's structure there's no need for any additional deductions.</sub>

By evaluating the potential xch price against energy costs, it's clear that Eco3x and Pro4x are compelling for those seeking profitability over minimal energy use. For example, if your electricity costs are $0.14 per kWh with XCH priced at $30:

Expand Down
Binary file modified images/Eco3x-Pro4x-vs-NoSSDC15.png
Loading
Sorry, something went wrong. Reload?
Sorry, we cannot display this file.
Sorry, this file is invalid so it cannot be displayed.

0 comments on commit ca0b89b

Please sign in to comment.