pyln_client: (re-)adds method description to usage via docstring #10989
ci.yaml
on: pull_request
Pre-build checks
11m 41s
Matrix: compile
Run fuzz regression tests
9m 23s
Matrix: Run unit tests
Matrix: Sanitizers Test CLN
Matrix: integration-valgrind
Matrix: integration
Matrix: min-btc-support
CI completion
0s
Annotations
9 errors
Valgrind Test CLN Valgrind (03/10)
Process completed with exit code 1.
|
Valgrind Test CLN Valgrind (09/10)
The job was canceled because "Valgrind__03_10__--test-g" failed.
|
Valgrind Test CLN Valgrind (09/10)
The operation was canceled.
|
Valgrind Test CLN Valgrind (08/10)
The job was canceled because "Valgrind__03_10__--test-g" failed.
|
Valgrind Test CLN Valgrind (08/10)
The operation was canceled.
|
Valgrind Test CLN Valgrind (07/10)
The job was canceled because "Valgrind__03_10__--test-g" failed.
|
Valgrind Test CLN Valgrind (07/10)
The operation was canceled.
|
Valgrind Test CLN Valgrind (10/10)
The job was canceled because "Valgrind__03_10__--test-g" failed.
|
Valgrind Test CLN Valgrind (10/10)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
cln-compile-clang-sanitizers.tar.bz2
Expired
|
179 MB |
|
cln-compile-clang.tar.bz2
Expired
|
123 MB |
|
cln-compile-gcc-O3.tar.bz2
Expired
|
152 MB |
|
cln-compile-gcc.tar.bz2
Expired
|
122 MB |
|