Skip to content

askrene: fixup fee and delay computation #11023

askrene: fixup fee and delay computation

askrene: fixup fee and delay computation #11023

Triggered via pull request September 25, 2024 19:10
Status Failure
Total duration 1h 0m 49s
Artifacts 4

ci.yaml

on: pull_request
Pre-build checks
11m 5s
Pre-build checks
Matrix: compile
Run fuzz regression tests
9m 24s
Run fuzz regression tests
Matrix: Run unit tests
Matrix: Sanitizers Test CLN
Matrix: integration-valgrind
Matrix: integration
Matrix: min-btc-support
CI completion
0s
CI completion
Fit to window
Zoom out
Zoom in

Annotations

34 errors
Sanitizers Test CLN (ASan/UBSan (01/10), --test-group=1 --test-group-count=10)
Process completed with exit code 1.
Sanitizers Test CLN (ASan/UBSan (02/10), --test-group=2 --test-group-count=10 -n 1)
The job was canceled because "ASan_UBSan__01_10__--test" failed.
Sanitizers Test CLN (ASan/UBSan (08/10), --test-group=8 --test-group-count=10)
The job was canceled because "ASan_UBSan__01_10__--test" failed.
Sanitizers Test CLN (ASan/UBSan (03/10), --test-group=3 --test-group-count=10)
The job was canceled because "ASan_UBSan__01_10__--test" failed.
Sanitizers Test CLN (ASan/UBSan (10/10), --test-group=10 --test-group-count=10)
The job was canceled because "ASan_UBSan__01_10__--test" failed.
Sanitizers Test CLN (ASan/UBSan (07/10), --test-group=7 --test-group-count=10)
The job was canceled because "ASan_UBSan__01_10__--test" failed.
Sanitizers Test CLN (ASan/UBSan (09/10), --test-group=9 --test-group-count=10)
The job was canceled because "ASan_UBSan__01_10__--test" failed.
Sanitizers Test CLN (ASan/UBSan (06/10), --test-group=6 --test-group-count=10)
The job was canceled because "ASan_UBSan__01_10__--test" failed.
Sanitizers Test CLN (ASan/UBSan (04/10), --test-group=4 --test-group-count=10)
The job was canceled because "ASan_UBSan__01_10__--test" failed.
Test CLN liquid
Process completed with exit code 1.
Test CLN clang
The job was canceled because "liquid_compile-gcc_gcc_li" failed.
Test CLN clang
The operation was canceled.
Test CLN postgres
The job was canceled because "liquid_compile-gcc_gcc_li" failed.
Test CLN postgres
The operation was canceled.
Test CLN gcc
The job was canceled because "liquid_compile-gcc_gcc_li" failed.
Test CLN gcc
The operation was canceled.
Test CLN splicing
The job was canceled because "liquid_compile-gcc_gcc_li" failed.
Test CLN splicing
The operation was canceled.
Test minimum supported BTC v25.0 with clang
Process completed with exit code 1.
Valgrind Test CLN Valgrind (01/10)
Process completed with exit code 1.
Valgrind Test CLN Valgrind (09/10)
The job was canceled because "Valgrind__01_10__--test-g" failed.
Valgrind Test CLN Valgrind (09/10)
The operation was canceled.
Valgrind Test CLN Valgrind (04/10)
The job was canceled because "Valgrind__01_10__--test-g" failed.
Valgrind Test CLN Valgrind (04/10)
The operation was canceled.
Valgrind Test CLN Valgrind (07/10)
The job was canceled because "Valgrind__01_10__--test-g" failed.
Valgrind Test CLN Valgrind (07/10)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
cln-compile-clang-sanitizers.tar.bz2 Expired
179 MB
cln-compile-clang.tar.bz2 Expired
123 MB
cln-compile-gcc-O3.tar.bz2 Expired
152 MB
cln-compile-gcc.tar.bz2 Expired
122 MB