Skip to content

[NOT FOR MERGE] test with scala 3.6 #1419

[NOT FOR MERGE] test with scala 3.6

[NOT FOR MERGE] test with scala 3.6 #1419

Triggered via pull request December 14, 2024 11:08
Status Failure
Total duration 55s
Artifacts

ci.yml

on: pull_request
Matrix: Build and Test
Matrix: Publish Artifacts
Fit to window
Zoom out
Zoom in

Annotations

30 errors and 2 warnings
Build and Test (ubuntu-latest, 2.13.15, zulu@8)
Process completed with exit code 1.
Build and Test (ubuntu-latest, 2.11.12, zulu@8)
Process completed with exit code 1.
Build and Test (ubuntu-latest, 2.12.20, zulu@8)
The job was canceled because "ubuntu-latest_2_13_15_zul" failed.
Build and Test (ubuntu-latest, 2.12.20, zulu@8)
Process completed with exit code 1.
Build and Test (ubuntu-latest, 3.3.4, zulu@8)
The job was canceled because "ubuntu-latest_2_13_15_zul" failed.
Build and Test (ubuntu-latest, 3.3.4, zulu@8)
The operation was canceled.
Build and Test (ubuntu-latest, 2.12.20, zulu@17)
The job was canceled because "ubuntu-latest_2_13_15_zul" failed.
Build and Test (ubuntu-latest, 2.12.20, zulu@17)
The operation was canceled.
Build and Test (ubuntu-latest, 2.12.20, zulu@21)
The job was canceled because "ubuntu-latest_2_13_15_zul" failed.
Build and Test (ubuntu-latest, 2.12.20, zulu@21)
The operation was canceled.
Build and Test (ubuntu-latest, 3.3.4, zulu@17)
The job was canceled because "ubuntu-latest_2_13_15_zul" failed.
Build and Test (ubuntu-latest, 3.3.4, zulu@17)
The operation was canceled.
Build and Test (ubuntu-latest, 2.11.12, zulu@17)
The job was canceled because "ubuntu-latest_2_13_15_zul" failed.
Build and Test (ubuntu-latest, 2.11.12, zulu@17)
The operation was canceled.
Build and Test (ubuntu-latest, 3.3.4, zulu@21)
The job was canceled because "ubuntu-latest_2_13_15_zul" failed.
Build and Test (ubuntu-latest, 3.3.4, zulu@21)
The operation was canceled.
Build and Test (ubuntu-latest, 2.13.15, zulu@21)
The job was canceled because "ubuntu-latest_2_13_15_zul" failed.
Build and Test (ubuntu-latest, 2.13.15, zulu@21)
The operation was canceled.
Build and Test (ubuntu-latest, 2.13.15, zulu@17)
The job was canceled because "ubuntu-latest_2_13_15_zul" failed.
Build and Test (ubuntu-latest, 2.13.15, zulu@17)
The operation was canceled.
Build and Test (ubuntu-latest, 2.12.20, zulu@11)
The job was canceled because "ubuntu-latest_2_13_15_zul" failed.
Build and Test (ubuntu-latest, 3.3.4, zulu@11)
The job was canceled because "ubuntu-latest_2_13_15_zul" failed.
Build and Test (ubuntu-latest, 2.12.20, zulu@11)
The operation was canceled.
Build and Test (ubuntu-latest, 3.3.4, zulu@11)
The operation was canceled.
Build and Test (ubuntu-latest, 2.13.15, zulu@11)
The job was canceled because "ubuntu-latest_2_13_15_zul" failed.
Build and Test (ubuntu-latest, 2.13.15, zulu@11)
The operation was canceled.
Build and Test (ubuntu-latest, 2.11.12, zulu@11)
The job was canceled because "ubuntu-latest_2_13_15_zul" failed.
Build and Test (ubuntu-latest, 2.11.12, zulu@11)
The operation was canceled.
Build and Test (ubuntu-latest, 2.11.12, zulu@21)
The job was canceled because "ubuntu-latest_2_13_15_zul" failed.
Build and Test (ubuntu-latest, 2.11.12, zulu@21)
The operation was canceled.
Build and Test (ubuntu-latest, 2.13.15, zulu@8)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
Build and Test (ubuntu-latest, 2.11.12, zulu@8)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636