Skip to content

Update test_pr_and_main.yml #12

Update test_pr_and_main.yml

Update test_pr_and_main.yml #12

Triggered via push January 24, 2024 18:38
Status Failure
Total duration 1m 36s
Artifacts
Check code formatting (Black)
43s
Check code formatting (Black)
Check Spelling
13s
Check Spelling
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

15 errors
ubuntu-latest/3.9
Process completed with exit code 1.
ubuntu-latest/3.11
The job was canceled because "ubuntu-latest_3_9" failed.
ubuntu-latest/3.11
The operation was canceled.
ubuntu-latest/3.10
The job was canceled because "ubuntu-latest_3_9" failed.
ubuntu-latest/3.10
Process completed with exit code 1.
ubuntu-latest/3.8
The job was canceled because "ubuntu-latest_3_9" failed.
ubuntu-latest/3.8
The operation was canceled.
windows-latest/3.11
The job was canceled because "ubuntu-latest_3_9" failed.
windows-latest/3.11
The operation was canceled.
windows-latest/3.10
The job was canceled because "ubuntu-latest_3_9" failed.
windows-latest/3.10
The operation was canceled.
windows-latest/3.9
The job was canceled because "ubuntu-latest_3_9" failed.
windows-latest/3.9
The operation was canceled.
windows-latest/3.8
The job was canceled because "ubuntu-latest_3_9" failed.
windows-latest/3.8
The operation was canceled.