Skip to content

NTO-180 merged upstream changes #21

NTO-180 merged upstream changes

NTO-180 merged upstream changes #21

Triggered via pull request March 28, 2024 00:24
@akhumphreyakhumphrey
synchronize #10
integration
Status Failure
Total duration 2m 15s
Artifacts

continuous-integration.yml

on: pull_request
Matrix: Symfony1 Tests
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Symfony1 Tests (7.4, 1.6)
Process completed with exit code 1.
Symfony1 Tests (8.1, 1.6)
The job was canceled because "_7_4_1_6" failed.
Symfony1 Tests (8.1, 1.6)
Process completed with exit code 1.
Symfony1 Tests (8.3, 1.6)
The job was canceled because "_7_4_1_6" failed.
Symfony1 Tests (8.3, 1.6)
The operation was canceled.
Symfony1 Tests (8.2, 1.6)
The job was canceled because "_7_4_1_6" failed.
Symfony1 Tests (8.2, 1.6)
Process completed with exit code 1.