Skip to content

chore(deps): update dependency crypto-ld to v7 #4410

chore(deps): update dependency crypto-ld to v7

chore(deps): update dependency crypto-ld to v7 #4410

Triggered via pull request September 5, 2024 15:45
Status Failure
Total duration 7m 32s
Artifacts 2

tests.yml

on: pull_request
check_skip
0s
check_skip
cache_imgs
3s
cache_imgs
bundle_cache
33s
bundle_cache
Matrix: test
Matrix: integration_test
Matrix: bundle_test
Fit to window
Zoom out
Zoom in

Annotations

6 errors
test (22, optional)
Process completed with exit code 1.
test (18, required)
Process completed with exit code 1.
test (16, optional)
The job was canceled because "_18_required" failed.
test (16, optional)
The operation was canceled.
test (20, required)
The job was canceled because "_18_required" failed.
test (20, required)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
build
75.9 MB
checked-nonmin-bundle
854 KB