Resolve Pydantic 2.10.0 conflict issue with latest LlamaIndex (#973) #49
gpu-docker-push.yml
on: push
check-version
4s
Matrix: build-and-push
Annotations
3 errors and 1 warning
build-and-push (gpu)
buildx failed with: ERROR: failed to solve: process "/bin/sh -c pip install -e \".[gpu]\"" did not complete successfully: exit code: 1
|
build-and-push (gpu-parsing)
The job was canceled because "gpu" failed.
|
build-and-push (gpu-parsing)
buildx failed with: ERROR: failed to solve: process "/bin/sh -c pip install -e \".[gpu]\"" did not complete successfully: exit code: 1
|
build-and-push (gpu-parsing)
You are running out of disk space. The runner will stop working when the machine runs out of disk space. Free space left: 21 MB
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
Marker-Inc-Korea~AutoRAG~303ZNA.dockerbuild
|
63.6 KB |
|
Marker-Inc-Korea~AutoRAG~5KPTZ0.dockerbuild
|
63.7 KB |
|