Skip to content

main: Test Deployment #84

main: Test Deployment

main: Test Deployment #84

Triggered via schedule September 7, 2024 01:38
Status Failure
Total duration 6h 5m 31s
Artifacts

tests-deployment.yml

on: schedule
Matrix: Cluster
Matrix: Node Matrix
Matrix: Node
Fit to window
Zoom out
Zoom in

Annotations

8 errors
Node Matrix (k3s, v1.28.10, centos9, cilium)
Process completed with exit code 1.
Node Matrix (k3s, v1.28.10, centos9, flannel)
unable to access 'https://github.com/MusicDin/kubitect/': Failed to connect to github.com port 443 after 134696 ms: Connection timed out
Node Matrix (k3s, v1.28.10, centos9, flannel)
unable to access 'https://github.com/MusicDin/kubitect/': Failed to connect to github.com port 443 after 134484 ms: Connection timed out
Node Matrix (kubespray, v1.29.5, centos9, kube-router)
Process completed with exit code 1.
Node Matrix (k3s, v1.27.14, rocky9, calico)
The job running on runner GitHub Actions 4 has exceeded the maximum execution time of 360 minutes.
Node Matrix (k3s, v1.27.14, rocky9, calico)
The operation was canceled.
Node Matrix (k3s, v1.28.10, rocky9, flannel)
The job running on runner GitHub Actions 18 has exceeded the maximum execution time of 360 minutes.
Node Matrix (k3s, v1.28.10, rocky9, flannel)
The operation was canceled.