Update GH artifact to v4 (#18) #79
test.yml
on: push
build
/
Build Package
8s
Matrix: Run Pytest
Annotations
7 errors and 2 warnings
Run Pytest (3.11.8)
Process completed with exit code 127.
|
Run Pytest (3.9)
The job was canceled because "_3_11_8" failed.
|
Run Pytest (3.9)
The operation was canceled.
|
Run Pytest (3.8)
The job was canceled because "_3_11_8" failed.
|
Run Pytest (3.8)
The operation was canceled.
|
Run Pytest (3.10)
The job was canceled because "_3_11_8" failed.
|
Run Pytest (3.10)
The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
|
build / Build Package
The following actions use a deprecated Node.js version and will be forced to run on node20: actions/checkout@v3, actions/setup-python@v4. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/
|
Run Pytest (3.11.8)
The following actions use a deprecated Node.js version and will be forced to run on node20: actions/checkout@v3, actions/setup-python@v4. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
odm_bin_package
Expired
|
22.2 KB |
|
odm_src_package
Expired
|
19 KB |
|