Skip to content

cups.service.in: Order after time-set.target #2869

cups.service.in: Order after time-set.target

cups.service.in: Order after time-set.target #2869

Re-run triggered September 20, 2024 06:16
Status Failure
Total duration 6h 0m 33s
Artifacts

build.yml

on: pull_request
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 3 warnings
build-macos
The hosted runner: GitHub Actions 15 lost communication with the server. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.
build-linux-i386
The job running on runner GitHub Actions 1 has exceeded the maximum execution time of 360 minutes.
build-linux-i386
The operation was canceled.
build-linux
The job running on runner GitHub Actions 6 has exceeded the maximum execution time of 360 minutes.
build-linux
The operation was canceled.
build-macos
libpng 1.6.44 is already installed and up-to-date. To reinstall 1.6.44, run: brew reinstall libpng
build-macos
libusb 1.0.27 is already installed and up-to-date. To reinstall 1.0.27, run: brew reinstall libusb
build-macos
openssl@3 3.3.2 is already installed and up-to-date. To reinstall 3.3.2, run: brew reinstall openssl@3