Skip to content

Build package

Build package #389

Triggered via schedule November 24, 2023 00:50
Status Failure
Total duration 6h 0m 16s
Artifacts

build.yml

on: schedule
Build on Ubuntu Focal
6h 0m
Build on Ubuntu Focal
Matrix: Build on Ubuntu Jammy
Fit to window
Zoom out
Zoom in

Annotations

6 errors
Build on Ubuntu Focal
The job running on runner GitHub Actions 3 has exceeded the maximum execution time of 360 minutes.
Build on Ubuntu Focal
The operation was canceled.
Build on Ubuntu Jammy (humble)
The job running on runner GitHub Actions 2 has exceeded the maximum execution time of 360 minutes.
Build on Ubuntu Jammy (humble)
The operation was canceled.
Build on Ubuntu Jammy (rolling)
The job running on runner GitHub Actions 4 has exceeded the maximum execution time of 360 minutes.
Build on Ubuntu Jammy (rolling)
The operation was canceled.