chore(deps-dev): bump the dev-dependencies group across 1 directory with 9 updates #113
Triggered via pull request
September 27, 2024 19:57
Status
Failure
Total duration
1m 14s
Artifacts
–
visual-regression-diff-build.yml
on: pull_request
Matrix: visual-diff snapshot
visual-diff report
0s
Annotations
3 errors
visual-diff snapshot (1/2)
Process completed with exit code 1.
|
visual-diff snapshot (2/2)
The job was canceled because "_1_2" failed.
|
visual-diff snapshot (2/2)
Process completed with exit code 1.
|