Skip to content

Add compat downgrade YAML #2269

Add compat downgrade YAML

Add compat downgrade YAML #2269

Re-run triggered December 11, 2023 17:44
Status Cancelled
Total duration 2m 11s
Artifacts

CI.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

20 errors
test (InterfaceI, 1.9)
The operation was canceled.
test (ODEInterfaceRegression, 1)
The operation was canceled.
test (Downstream, 1.9)
The operation was canceled.
test (AlgConvergence_II, 1)
The operation was canceled.
test (Integrators_I, 1)
The operation was canceled.
test (Downstream, 1)
The operation was canceled.
test (AlgConvergence_III, 1.9)
The operation was canceled.
test (AlgConvergence_I, 1.9)
The operation was canceled.
test (InterfaceII, 1.9)
The operation was canceled.
test (InterfaceIII, 1.9)
The operation was canceled.
test (AlgConvergence_III, 1)
The operation was canceled.
test (AlgConvergence_I, 1)
The operation was canceled.
test (AlgConvergence_II, 1.9)
The operation was canceled.
test (Multithreading, 1.9)
The operation was canceled.
test (InterfaceI, 1)
The operation was canceled.
test (Integrators_I, 1.9)
The operation was canceled.
test (ODEInterfaceRegression, 1.9)
The operation was canceled.
test (InterfaceII, 1)
The operation was canceled.
test (InterfaceIII, 1)
The operation was canceled.
test (Multithreading, 1)
The operation was canceled.