Skip to content

fix build with new protobuf target (#4955) #5338

fix build with new protobuf target (#4955)

fix build with new protobuf target (#4955) #5338

Triggered via push August 22, 2023 06:07
Status Cancelled
Total duration 3m 14s
Artifacts
Matrix: Analyze
Fit to window
Zoom out
Zoom in

Annotations

2 errors and 1 warning
Analyze (cpp)
Canceling since a higher priority waiting request for 'CodeQL-refs/heads/master' exists
Analyze (cpp)
The operation was canceled.
Analyze (cpp)
1 issue was detected with this workflow: git checkout HEAD^2 is no longer necessary. Please remove this step as Code Scanning recommends analyzing the merge commit for best results.