Skip to content

chore(deps): bump github.com/google/btree from 1.1.2 to 1.1.3 (#19633) #32238

chore(deps): bump github.com/google/btree from 1.1.2 to 1.1.3 (#19633)

chore(deps): bump github.com/google/btree from 1.1.2 to 1.1.3 (#19633) #32238

Triggered via push August 22, 2024 17:18
Status Cancelled
Total duration 41m 36s
Artifacts 2

ci-build.yaml

on: push
changes
5s
changes
Build & cache Go code
3m 6s
Build & cache Go code
Build, test & lint UI code
1m 48s
Build, test & lint UI code
Ensure Go modules synchronicity
41s
Ensure Go modules synchronicity
Lint Go code
3m 27s
Lint Go code
Check changes to generated code
6m 4s
Check changes to generated code
Matrix: Run end-to-end tests
Run unit tests for Go packages
4m 42s
Run unit tests for Go packages
Run unit tests with -race for Go packages
8m 14s
Run unit tests with -race for Go packages
E2E Tests - Composite result
0s
E2E Tests - Composite result
Process & analyze test artifacts
0s
Process & analyze test artifacts
Fit to window
Zoom out
Zoom in

Annotations

9 errors
Run end-to-end tests (v1.27.15, false)
Canceling since a higher priority waiting request for 'Integration tests-refs/heads/master' exists
Run end-to-end tests (v1.27.15, false)
The operation was canceled.
Run end-to-end tests (v1.30.2, true)
Canceling since a higher priority waiting request for 'Integration tests-refs/heads/master' exists
Run end-to-end tests (v1.30.2, true)
The operation was canceled.
Run end-to-end tests (v1.28.11, false)
Canceling since a higher priority waiting request for 'Integration tests-refs/heads/master' exists
Run end-to-end tests (v1.28.11, false)
The operation was canceled.
Run end-to-end tests (v1.29.6, false)
Canceling since a higher priority waiting request for 'Integration tests-refs/heads/master' exists
Run end-to-end tests (v1.29.6, false)
The operation was canceled.
E2E Tests - Composite result
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
race-results
1.23 MB
test-results
1.23 MB