Skip to content

fix(notifications): Allow notifications controller to notify on all namespaces (cherry-pick 2.6) #24809

fix(notifications): Allow notifications controller to notify on all namespaces (cherry-pick 2.6)

fix(notifications): Allow notifications controller to notify on all namespaces (cherry-pick 2.6) #24809

Triggered via pull request October 25, 2023 18:54
Status Failure
Total duration 54m 34s
Artifacts 3
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

ci-build.yaml

on: pull_request
Build & cache Go code
4m 27s
Build & cache Go code
Build, test & lint UI code
2m 13s
Build, test & lint UI code
Ensure Go modules synchronicity
21s
Ensure Go modules synchronicity
Lint Go code
41s
Lint Go code
Check changes to generated code
12m 11s
Check changes to generated code
Run unit tests for Go packages
7m 48s
Run unit tests for Go packages
Run unit tests with -race, for Go packages
10m 49s
Run unit tests with -race, for Go packages
Matrix: Run end-to-end tests
Process & analyze test artifacts
48s
Process & analyze test artifacts
Fit to window
Zoom out
Zoom in

Annotations

9 errors
Lint Go code
golangci-lint exit with code 2
Check changes to generated code
Process completed with exit code 1.
Run unit tests with -race, for Go packages: util/argo/normalizers/corev1_known_types.go#L640
syntax error: unexpected var after top level declaration
Run unit tests with -race, for Go packages
Process completed with exit code 2.
Run end-to-end tests (v1.24.3)
The action has timed out.
Run end-to-end tests (v1.22.6)
The job was canceled because "v1_24_3" failed.
Run end-to-end tests (v1.22.6)
The operation was canceled.
Run end-to-end tests (v1.23.3)
The job was canceled because "v1_24_3" failed.
Run end-to-end tests (v1.23.3)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
code-coverage Expired
3.7 MB
e2e-server-k8sv1.24.3.log Expired
80 KB
test-results Expired
41.7 KB