Skip to content

Ansible deployment test #188

Ansible deployment test

Ansible deployment test #188

Triggered via schedule December 9, 2024 05:17
Status Failure
Total duration 6h 0m 13s
Artifacts

ansible.yml

on: schedule
Matrix: podman
Fit to window
Zoom out
Zoom in

Annotations

4 errors and 4 warnings
Ansible (method=copr)
Process completed with exit code 2.
Ansible (method=copr avocado_vt=true)
Process completed with exit code 2.
Ansible (method=pip avocado_vt=true)
The job running on runner GitHub Actions 6 has exceeded the maximum execution time of 360 minutes.
Ansible (method=pip avocado_vt=true)
The operation was canceled.
Ansible (method=official)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
Ansible (method=copr)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
Ansible (method=pip)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
Ansible (method=copr avocado_vt=true)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636