Skip to content

chore: Updating cache in Integration Tests workflows #6

chore: Updating cache in Integration Tests workflows

chore: Updating cache in Integration Tests workflows #6

Triggered via push November 2, 2023 20:37
Status Cancelled
Total duration 5m 5s
Artifacts
Matrix: build-amplify-swift
Confirm Passing Build Steps
0s
Confirm Passing Build Steps
Fit to window
Zoom out
Zoom in

Annotations

4 errors
Build Amplify Swift for iOS / Build Amplify-Package | iOS
The operation was canceled.
Build Amplify Swift for macOS / Build Amplify-Package | macOS
The operation was canceled.
Build Amplify Swift for watchOS / Build Amplify-Package | watchOS
The operation was canceled.
Build Amplify Swift for tvOS / Build Amplify-Package | tvOS
The operation was canceled.