Skip to content

Releases: base-org/node

v0.10.1

10 Aug 02:19
d1639e1
Compare
Choose a tag to compare

This is a mandatory release for Base Sepolia nodes running Reth

This release contains upgrades for Reth clients operate with Granite hard fork for Base Sepolia Testnet on Mon Aug 12 16:00:00 UTC 2024. Geth client changes were included in v0.10.0

Changeset
op-node
v1.9.0
Changelog

op-reth
v1.0.5
Changelog

v0.10.0

08 Aug 03:48
90f047f
Compare
Choose a tag to compare

❗This is a mandatory release for Base Sepolia nodes

It contains the activation of the Granite hardfork on the Sepolia network on Mon Aug 12 16:00:00 UTC 2024.
Node operators of Base Sepolia nodes must update to this release before this activation timestamp, or their nodes will halt when the network activates Granite. It is a recommended update for mainnet nodes as it contains various improvements and bug fixes.

Note: This release contains Geth changes for Granite only. Reth compatibility for the Granite hard fork will be included in a future release.

OP Stack Changeset
op-node
v1.9.0
Changelog

op-geth
v1.101315.3
Changelog

v0.9.0

20 Jun 19:07
2dbf4a4
Compare
Choose a tag to compare

Protocol

❗ This is a mandatory release for Base Mainnet node operators. It includes the following protocol upgrade activation:

  • Fjord activates on Mainnet at Wed Jul 10 16:00:01 UTC 2024

RIP-7212, Improved L1 Data Efficiency, Improved L1 Gas Used Calculation and more.

OP Stack Changeset

v0.8.4

28 May 14:31
d3770e1
Compare
Choose a tag to compare

Protocol

❗ This is a mandatory release for Base Sepolia node operators. It includes the following protocol upgrade activation:

  • Fjord activates on Sepolia at Wed May 29 16:00:00 UTC 2024

✨ The Fjord features can be found here.

OP Stack Changeset

v0.8.3

15 May 20:59
e1645a4
Compare
Choose a tag to compare

⬆️ This is a recommended release for node operators. It addresses a security advisory in go-ethereum, see CVE-2024-32972 for more details.

OP Stack Changeset

op-geth
v1.101315.0
Changelog

v0.8.2

03 May 17:23
c0b0349
Compare
Choose a tag to compare

⚠️ This is a highly recommended maintenance release for all node operators It fixes a potential bug in derivation that can lead to a halted node.

OP Stack Changeset

op-node
v1.7.5
Changelog

op-geth
v1.101311.0
Changelog

v0.8.1

13 Mar 02:26
f6c2e9d
Compare
Choose a tag to compare

⬆️ This is a recommended release for node operators using Snap Sync on Base Mainnet & Sepolia. For other users, this is a minor release. Node operators should be on at least v0.8.0.

Changes

  • This release contains a fix to snap sync to ensure that all blocks are inserted to the execution engine when snap sync completes. Previously once snap sync would complete, if blocks where received out of order, the op-node could have internally inconsistent state & the unsafe head could stall for a period of time.
  • This release also contains a safeDB feature which tracks the L1 block L2 blocks are derived from.

v0.8.0

27 Feb 02:56
1ec2d9c
Compare
Choose a tag to compare

Protocol

❗ This is a mandatory release for Base Mainnet node operators. It includes the following protocol upgrade activation:

  • Ecotone activates on Mainnet at Thu Mar 14 00:00:01 UTC 2024

✨ The Ecotone upgrade brings 4844 and Cancun extensions to the L2.

Config changes

  • For Ecotone, op-node needs to connect to an L1 beacon client to be able to fetch blobs. You must specify the endpoint with the --l1.beacon flag (or OP_NODE_L1_BEACON env var).
  • If you are using a Lighthouse CL client, you must update to at least the v4.6.0 finalized release.

OP Stack Changeset

v0.7.1

13 Feb 19:48
525775b
Compare
Choose a tag to compare

❗ This is a mandatory release for node operators on Sepolia. It includes the following protocol upgrade activation:

  • Ecotone activates on Sepolia at Wed Feb 21 17:00:00 UTC 2024

✨ The Ecotone upgrade brings 4844 and Cancun extensions to the L2.
🐛 This release also contains a fix for a tx receipt cache bug which would sometimes result in finalized/safe head stall

Config changes:
With the Ecotone upgrade, op-node needs to connect to an L1 beacon client in order to be able to fetch blobs, whose endpoint is specified with the --l1.beacon flag (or OP_NODE_L1_BEACON env var). If you are using a Lighthouse CL client, you must update to at least the v4.6.0 finalized release.

Versions:

Full changelog:
ethereum-optimism/optimism@v1.5.0...v1.5.1

v0.7.0

01 Feb 23:15
397e9cb
Compare
Choose a tag to compare

❗ This is a mandatory release for node operators on Mainnet and Goerli. It includes two protocol upgrade activations:

  • Delta activates on Mainnet at Thu Feb 22 00:00:00 UTC 2024
  • Ecotone activates on Goerli at Tue Feb 6 17:00:00 UTC 2024

✨ The Ecotone upgrade brings 4844 and Cancun extensions to the L2.
⚡ Other features in this release include experimental snap sync support for trusted environments and improved shutdown behavior of op-batcher

Config changes:
With the Ecotone upgrade, op-node needs to connect to an L1 beacon client in order to be able to fetch blobs, whose endpoint is specified with the --l1.beacon flag (or OP_NODE_L1_BEACON env var). If you are using a Lighthouse CL client, you must update to at least the v4.6.0 finalized release.

Full changelog:
ethereum-optimism/optimism@v1.4.3...v1.5.0