Skip to content

chore: merge with upstream v1.1.0 #602

chore: merge with upstream v1.1.0

chore: merge with upstream v1.1.0 #602

Triggered via pull request October 22, 2024 08:28
@yutianwuyutianwu
synchronize #163
merge-v1.1.0
Status Failure
Total duration 12m 29s
Artifacts

unit.yml

on: pull_request
Matrix: doc
Matrix: test
Ethereum state tests
5m 55s
Ethereum state tests
unit success
4s
unit success
Fit to window
Zoom out
Zoom in

Annotations

22 errors
doc tests (bsc)
Process completed with exit code 101.
doc tests (ethereum)
The job was canceled because "bsc" failed.
doc tests (ethereum)
Process completed with exit code 101.
doc tests (optimism)
The job was canceled because "bsc" failed.
doc tests (optimism)
Process completed with exit code 101.
test / bsc (1/3)
Process completed with exit code 101.
test / optimism (3/3)
The job was canceled because "_1_bsc" failed.
test / ethereum (3/3)
The job was canceled because "_1_bsc" failed.
test / bsc (3/3)
The job was canceled because "_1_bsc" failed.
test / bsc (3/3)
The operation was canceled.
test / bsc (2/3)
The job was canceled because "_1_bsc" failed.
test / bsc (2/3)
The operation was canceled.
test / optimism (2/3)
The job was canceled because "_1_bsc" failed.
test / optimism (2/3)
The operation was canceled.
test / ethereum (1/3)
The job was canceled because "_1_bsc" failed.
test / ethereum (1/3)
The operation was canceled.
test / optimism (1/3)
The job was canceled because "_1_bsc" failed.
test / optimism (1/3)
The operation was canceled.
test / ethereum (2/3)
The job was canceled because "_1_bsc" failed.
test / ethereum (2/3)
The operation was canceled.
Ethereum state tests
Process completed with exit code 101.
unit success
Process completed with exit code 1.