Skip to content
This repository has been archived by the owner on Feb 6, 2025. It is now read-only.

chore: merge upstream v1.1.1 #693

chore: merge upstream v1.1.1

chore: merge upstream v1.1.1 #693

Triggered via pull request November 14, 2024 07:42
Status Failure
Total duration 19m 13s
Artifacts

unit.yml

on: pull_request
Matrix: doc
Matrix: test
Ethereum state tests
18m 19s
Ethereum state tests
unit success
4s
unit success
Fit to window
Zoom out
Zoom in

Annotations

16 errors
test / bsc (2/3)
Process completed with exit code 100.
test / optimism (3/3)
The job was canceled because "_2_bsc" failed.
test / optimism (3/3)
The operation was canceled.
test / ethereum (1/3)
The job was canceled because "_2_bsc" failed.
test / ethereum (1/3)
The operation was canceled.
test / ethereum (3/3)
The job was canceled because "_2_bsc" failed.
test / ethereum (3/3)
The operation was canceled.
test / bsc (3/3)
The job was canceled because "_2_bsc" failed.
test / bsc (3/3)
The operation was canceled.
test / ethereum (2/3)
The job was canceled because "_2_bsc" failed.
test / ethereum (2/3)
The operation was canceled.
test / optimism (2/3)
The job was canceled because "_2_bsc" failed.
test / optimism (2/3)
The operation was canceled.
test / optimism (1/3)
The job was canceled because "_2_bsc" failed.
test / optimism (1/3)
The operation was canceled.
unit success
Process completed with exit code 1.