Skip to content

fix(deps): update dependency ruff to ~=0.8.0 #267

fix(deps): update dependency ruff to ~=0.8.0

fix(deps): update dependency ruff to ~=0.8.0 #267

Triggered via push November 24, 2024 10:21
Status Failure
Total duration 1m 24s
Artifacts 2

tests.yaml

on: push
Matrix: integration
Matrix: unit
Fit to window
Zoom out
Zoom in

Annotations

15 errors
unit (ubuntu-22.04)
Process completed with exit code 255.
unit (macos-latest)
The job was canceled because "ubuntu-22_04" failed.
unit (macos-latest)
The operation was canceled.
lint
Process completed with exit code 255.
integration (ubuntu-20.04)
Process completed with exit code 255.
unit (ubuntu-20.04)
The job was canceled because "ubuntu-22_04" failed.
unit (ubuntu-20.04)
The operation was canceled.
unit (windows-latest)
The job was canceled because "ubuntu-22_04" failed.
unit (windows-latest)
The operation was canceled.
integration (macos-latest)
The job was canceled because "ubuntu-20_04" failed.
integration (macos-latest)
The operation was canceled.
integration (ubuntu-22.04)
The job was canceled because "ubuntu-20_04" failed.
integration (ubuntu-22.04)
The operation was canceled.
integration (windows-latest)
The job was canceled because "ubuntu-20_04" failed.
integration (windows-latest)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
test-results-ubuntu-20.04
5.37 KB
test-results-ubuntu-22.04
6.98 KB