Skip to content

Switch Jira issue sync from workflow to bot (#10) #2

Switch Jira issue sync from workflow to bot (#10)

Switch Jira issue sync from workflow to bot (#10) #2

Triggered via push August 19, 2024 09:05
Status Failure
Total duration 27m 11s
Artifacts 5

release.yaml

on: push
Check libraries
29s
Check libraries
Build charm  /  Collect bases for charm | .
15s
Build charm / Collect bases for charm | .
Matrix: Tests / Build charm
Tests  /  ...  /  Lint .github/workflows/
6s
Tests / Lint / Lint .github/workflows/
Tests  /  ...  /  tox run -e lint
17s
Tests / Lint / tox run -e lint
Tests  /  Unit tests
14s
Tests / Unit tests
Matrix: Build charm / build
Matrix: Tests / integration-test
Release to CharmHub  /  Release charm
Release to CharmHub / Release charm
Fit to window
Zoom out
Zoom in

Annotations

2 errors and 1 warning
Tests / Integration test charm | 3.4.0 | lxd | amd64 / test_azure.py | group 1
Process completed with exit code 1.
Check libraries
The following actions use a deprecated Node.js version and will be forced to run on node20: canonical/charming-actions/check-libraries@2.4.0. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/

Artifacts

Produced during runtime
Name Size
logs-intergration-test-charm-lxd-juju-3.4.0-amd64-test_azure.py-group-1 Expired
25 KB
logs-intergration-test-charm-microk8s-juju-3.4.0-amd64-test_azure.py-group-1 Expired
4.59 KB
packed-charm-cache-false-.-base-0 Expired
5.58 MB
packed-charm-cache-true-.-base-0 Expired
5.58 MB
packed-charm-cache-true-tests-integration-test-charm-azure-base-0 Expired
5.64 MB