Skip to content

build(deps): bump golang.org/x/sync from 0.9.0 to 0.10.0 #839

build(deps): bump golang.org/x/sync from 0.9.0 to 0.10.0

build(deps): bump golang.org/x/sync from 0.9.0 to 0.10.0 #839

Triggered via push December 18, 2024 13:29
Status Failure
Total duration 8m 55s
Artifacts 1

test.yml

on: push
Matrix: Test
Fit to window
Zoom out
Zoom in

Annotations

1 error and 7 warnings
Test (5.10-20240201.165956)
Process completed with exit code 1.
build
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
Test (bpf-next-20240204.012837)
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
Test (6.1-20240201.165956)
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
Test (5.10-20240201.165956)
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
Test (5.10-20240201.165956)
No files were found with the provided path: /tmp/pwru-*. No artifacts will be uploaded.
Test (5.15-20240201.165956)
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
Test (5.4-20240201.165956)
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2

Artifacts

Produced during runtime
Name Size
pwru
3.07 MB