Skip to content

Update test.yml

Update test.yml #99

Triggered via push September 26, 2024 23:11
Status Failure
Total duration 1m 19s
Artifacts

test.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
test (3.13-dev, ubuntu-latest)
Process completed with exit code 1.
test (macos-latest, 3.12)
The job was canceled because "_3_13-dev_ubuntu-latest" failed.
test (macos-latest, 3.12)
A task was canceled.
test (3.12, ubuntu-latest)
The job was canceled because "_3_13-dev_ubuntu-latest" failed.
test (3.12, ubuntu-latest)
The operation was canceled.