Skip to content

Commit

Permalink
Clarify working group lead requirements (kubernetes#321)
Browse files Browse the repository at this point in the history
  • Loading branch information
craigbox committed May 12, 2020
1 parent b2ed0e2 commit 490880a
Showing 1 changed file with 2 additions and 3 deletions.
5 changes: 2 additions & 3 deletions WORKING-GROUP-PROCESSES.md
Original file line number Diff line number Diff line change
Expand Up @@ -87,10 +87,9 @@ technical oversight committee also reserves the right to dissolve or recharter w

## Leads

Each working group must have 2 or 3 leads, with at least two different organizations represented. Working group leads must be members of the
Istio project (that is, have made multiple contributions to the project in the form of code, design, or documentation).
Each working group must have 2 or 3 leads, with at least two different organizations represented. Working group leads must meet certain requirements, including having been members of the Istio project for a year, and a maintainer for at least 3 months.

Please see the [Community Roles](https://github.com/istio/community/blob/master/ROLES.md) document for a
Please see the [Community Roles](https://github.com/istio/community/blob/master/ROLES.md) document for a full
description of a lead’s role and requirements.

## Running a working group
Expand Down

0 comments on commit 490880a

Please sign in to comment.