Merge pull request #10742 from ulyssessouza/add-wait #363
merge.yml
on: push
bin-image
29m 37s
Matrix: Build and test
desktop-edge-test
3s
Annotations
3 errors
Build and test (desktop-macos, plugin)
Process completed with exit code 2.
|
Build and test (desktop-windows, plugin)
The job running on runner OVH12 has exceeded the maximum execution time of 15 minutes.
|
Build and test (desktop-windows, plugin)
The operation was canceled.
|