Skip to content

Merge pull request #16 from donquixote/issue-52-epic-group-integration #272

Merge pull request #16 from donquixote/issue-52-epic-group-integration

Merge pull request #16 from donquixote/issue-52-epic-group-integration #272

Triggered via push November 25, 2024 15:20
Status Failure
Total duration 2m 9s
Artifacts

ci.yaml

on: push
Matrix: Run tests
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Run tests (8.1)
Process completed with exit code 2.
Run tests (8.3)
The job was canceled because "_8_1" failed.
Run tests (8.3)
Process completed with exit code 2.
Run tests (8.2)
The job was canceled because "_8_1" failed.
Run tests (8.2)
Process completed with exit code 2.