Skip to content

fix get nodes

fix get nodes #74

Triggered via push December 30, 2023 04:35
Status Failure
Total duration 4m 5s
Artifacts

test.yml

on: push
Matrix: tests
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Test on go 1.19
Process completed with exit code 1.
Test on go 1.20
The job was canceled because "_1_19" failed.
Test on go 1.20
The operation was canceled.
Test on go 1.21
The job was canceled because "_1_19" failed.
Test on go 1.21
The operation was canceled.