Skip to content

Adds ilabs board and PSRAM support. #2148

Adds ilabs board and PSRAM support.

Adds ilabs board and PSRAM support. #2148

Triggered via pull request August 20, 2024 16:51
Status Failure
Total duration 6m 52s
Artifacts

pull-request.yml

on: pull_request
Spelling, Style, Boards, Package
1m 3s
Spelling, Style, Boards, Package
Build TinyUSB Examples
4m 5s
Build TinyUSB Examples
Windows
3m 4s
Windows
Build PlatformIO Examples
2m 57s
Build PlatformIO Examples
Matrix: build-linux
Matrix: Mac
Matrix: build-rp2350-linux
Matrix: build-variants
Fit to window
Zoom out
Zoom in

Annotations

21 errors
Spelling, Style, Boards, Package
Process completed with exit code 1.
Build RP2350 5
Process completed with exit code 1.
Build RP2350 2
The job was canceled because "_5" failed.
Build RP2350 4
The job was canceled because "_5" failed.
Build RP2350 2
The operation was canceled.
Build RP2350 4
The operation was canceled.
Build RP2350 1
The job was canceled because "_5" failed.
Build RP2350 1
The operation was canceled.
Build RP2350 3
The job was canceled because "_5" failed.
Build RP2350 3
The operation was canceled.
Build 5
Process completed with exit code 1.
Build 1
The job was canceled because "_5" failed.
Build 1
The operation was canceled.
Build 4
The job was canceled because "_5" failed.
Build 4
The operation was canceled.
Build 2
The job was canceled because "_5" failed.
Build 2
The operation was canceled.
Build 0
The job was canceled because "_5" failed.
Build 0
The operation was canceled.
Build 3
The job was canceled because "_5" failed.
Build 3
The operation was canceled.