Skip to content

chore: move backend tls test resources out of the base #12719

chore: move backend tls test resources out of the base

chore: move backend tls test resources out of the base #12719

Triggered via pull request July 16, 2024 03:22
Status Failure
Total duration 49m 27s
Artifacts 1

build_and_test.yaml

on: pull_request
Matrix: conformance-test
Matrix: e2e-test
publish
0s
publish
Fit to window
Zoom out
Zoom in

Annotations

8 errors
e2e-test (v1.28.9)
Process completed with exit code 2.
e2e-test (v1.27.13)
The job was canceled because "v1_28_9" failed.
e2e-test (v1.27.13)
The operation was canceled.
e2e-test (v1.29.4)
The job was canceled because "v1_28_9" failed.
e2e-test (v1.29.4)
The operation was canceled.
e2e-test (v1.30.0)
The job was canceled because "v1_28_9" failed.
e2e-test (v1.30.0)
The operation was canceled.
benchmark-test
Process completed with exit code 2.

Artifacts

Produced during runtime
Name Size
envoy-gateway
168 MB