Skip to content

add tests for syntax highlighting #27

add tests for syntax highlighting

add tests for syntax highlighting #27

Triggered via push November 9, 2023 20:10
Status Failure
Total duration 45m 30s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

ci.yml

on: push
Check fmt & build docs
10s
Check fmt & build docs
Matrix: Build & Test
Matrix: Minimal versions check
Matrix: Miri
Fit to window
Zoom out
Zoom in

Annotations

22 errors
Build & Test (fancy, stable, ubuntu-latest)
Process completed with exit code 101.
Build & Test (syntect-highlighter, stable, windows-latest)
The job was canceled because "fancy_stable_ubuntu-lates" failed.
Build & Test (syntect-highlighter, stable, windows-latest)
The operation was canceled.
Build & Test (syntect-highlighter, stable, macOS-latest)
The operation was canceled.
Minimal versions check (ubuntu-latest)
Process completed with exit code 101.
Build & Test (fancy, stable, macOS-latest)
The operation was canceled.
Build & Test (fancy, 1.56.0, windows-latest)
The operation was canceled.
Build & Test (syntect-highlighter, 1.60.0, windows-latest)
The operation was canceled.
Build & Test (syntect-highlighter, 1.60.0, macOS-latest)
The operation was canceled.
Build & Test (fancy, 1.56.0, macOS-latest)
The operation was canceled.
Build & Test (syntect-highlighter, stable, ubuntu-latest)
The job was canceled because "fancy_stable_ubuntu-lates" failed.
Build & Test (syntect-highlighter, stable, ubuntu-latest)
The operation was canceled.
Build & Test (fancy, stable, windows-latest)
The operation was canceled.
Minimal versions check (windows-latest)
The operation was canceled.
Build & Test (syntect-highlighter, 1.60.0, ubuntu-latest)
The job was canceled because "fancy_stable_ubuntu-lates" failed.
Build & Test (syntect-highlighter, 1.60.0, ubuntu-latest)
The operation was canceled.
Build & Test (fancy, 1.56.0, ubuntu-latest)
The job was canceled because "fancy_stable_ubuntu-lates" failed.
Build & Test (fancy, 1.56.0, ubuntu-latest)
The operation was canceled.
Minimal versions check (macOS-latest)
The job was canceled because "ubuntu-latest" failed.
Minimal versions check (macOS-latest)
The operation was canceled.
Miri (syntect-highlighter)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
Miri (syntect-highlighter)
The operation was canceled.