fix(general
): get ci green on 6219
#10263
You are viewing an older attempt in the history of this workflow run.
View latest attempt.
test.yml
on: pull_request
build matrices
4s
doctest
2m 57s
clippy
34s
rustfmt
13s
forge-fmt
1m 11s
crate-checks
2m 5s
Matrix: test
Annotations
4 errors
test integration / issue-repros (1/2) (x86_64-unknown-linux-gnu)
The run was canceled by @Evalir.
|
test integration / issue-repros (1/2) (x86_64-unknown-linux-gnu)
The operation was canceled.
|
|
clippy
The operation was canceled.
|