Skip to content

Auto pairing

Auto pairing #7210

Triggered via pull request December 21, 2024 20:07
@gbtamigbtami
synchronize #1729
auto-pairing
Status Failure
Total duration 44s
Artifacts

ci.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 1 warning
build (3.10)
Process completed with exit code 1.
build (3.11)
The job was canceled because "_3_10" failed.
build (3.11)
Process completed with exit code 1.
build (3.12)
The job was canceled because "_3_10" failed.
build (3.12)
The operation was canceled.
build (3.9)
The job was canceled because "_3_10" failed.
build (3.9)
The operation was canceled.
build (3.10)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636